Left Click on any of the "thumbnail" pictures below to view the full size picture  
 Click on your BACK button to return to this page !
 

 


24 - 31 May 2007
 

 Thursday - 24 May (Day Eleven)
The Framers Started Around 10:00AM and Worked Until 8:00PM. Unbelievable Team Work! Fast Fast Fast!
 
Builder
Aaron Neal
11:00AM
Framers Lay
Out Walls
On Floor
By 6:30PM The Framers Have Made Incredible progress!
They Organized Into Teams To Haul The Lumber, Measure, Cut,
Nail Walls Together, Set Walls Upright, Etc.
It's Like Watching An Assembly Line !

 
 
Dale's Porch Takes Shape
Our New Living Room Will
Have A 12 Foot Ceiling
View From
The Porch, Down
The Corridor
To New
Living Room

 
 
Dale's Screen-In Porch & 'Hobby Room' To The Rear
A Better
View Of The
Hobby Room
On The Right
By 8:00PM They Had All The Walls
Up, (Some CoveredWith Plywood)
And Half the Ceiling Joists In Place
For The Second Floor Rooms!

 Friday - May 25th (Day Twelve)
Lopez Framers Work Like They're On An Assembly Line!
They Finish The Job In Only Three Days (Saturday)
While We Are In Augusta, GA With Joe & Sharon King.
 
The Roof For Dale's Huge Screened-In Porch Going Up !
Barry's
Library
Office
Den
Roof Going Up!

 
 
'Hip Roof'
Style For
Dale's Porch
Connecting To
Existing House
Dale's Porch Styled Like
A Hawaiian Beach Pavillion
Connecting To
The Existing
House Roof

 
 
Panoramic View Of Back Yard Work Area
Walls & Roofs Done
In Two Days

 
 
12' High
Living Room
Ceiling
Living Room
Roof
By 7:00PM Of Day Two
The Roof Sheathing Is On
Time To
Relax! Dale
At Dead
Dog Saloon
Murrell's Inlet

 Dead Dog Saloon
Murrell's Inlet, SC
 
Joe & Sharon
The Lubricators
Dale
Waterview & Bar

 
 
Waterview From Dead Dog Saloon, Murrell's Inlet
Boardwalk
In Front
Of Dead Dog
Saloon
Boardwalk
Entrance

 
 
Dale & Barry
Joe & Sharon
Dead Dog
Main Bar
Neon Sign
Dead Dog
From Parking
Lot. We'll
Be Back !
 
 

 26 - 27 May Visit to Augusta, Georgia With Sharon & Joe
 
Framers Begin
Third Day
We Leave On
Trip To Georgia
Sharon's Aunt
Margaret
Sharon & Joe
Augusta, GA
Sharon's
Aunt's Home
 
 

 27 May - On Our Return From Augusta
We Encounter An Air Show In Florence, South Carolina
 
Straight Up !
And
Back
Over
Levels Out !
Loop de Loop
Low Level
Run

 27 May - Framers Finished Yesterday Evening !
They Erected Our House Addition In Only Three Days !
 
Left-To-Right:
Living Room
Corridor & Office/Library
Dale's Porch & Hobby Room
Closeup View Of Dale's Porch
My Den/Office Windows In
Background
Dale's Porch
And
Hobby Room

 
 
Sharon
Dale
Joe
Barry & Dale
Barry's New Office
Our New Living Room

 
 
Dale
Corridor
To Her
Porch
Dale & Joe
Inspect
Barry's Office
Attic Area
Above Barry's
Office
One Side Of
Attic Area
Above Dale's
Porch
 
 

 28 May - Linda & Larry Gross Invite Us Out For A
Memorial Day Cruise On The Intra-Coastal Waterway
 
Captain Larry, Joe & Sharon
Aboard The Yacht 'Wastin Away'
Dale Shows Joe & Sharon
How To Relax !
Quick
Learners !

 
 
Captain Larry
Master Of The
Chris Craft
Sharon & Dale
This Guy's In A
Hurry But His
Boat Performs
Like A Barge !
Joe And The Beautiful Wastin' Away
Tied Up At The Grande Dunes
Marina, Where We Will Have Dinner
(Gawd .... Life Is Good :-)

 
 
Joe & The
Wastin' Away
Grande Dunes
Marina
Dale
Nighttime
Return To
Socastee
Capn Troy
Passes In
The Night
Cap'n Larry
Has The
Helm !
Linda, Sharon & Dale
Relaxing
Night Voyage
Back Home

 Wednesday 30 May - 'Day Seventeen' Of Construction
 
The New Living Room
Small Windows Added
The House Is 'Wrapped'
Dale's Porch

 
 
Dale's
Porch
The House Is 'Wrapped' !
Air Conditioning
Ducts Installed
Today
Original Doors
& Windows To
Outside Patio
Will Be
Removed Last

 Thursday 31 May - 'Day Eighteen' - Roofing Begins
 
'Kneewall Goes
Up On
Dale's Porch !
Roofing
Begins
Lots of
Weight
(Shingles)
Roofers
Work
Quickly
Barry Reruns
Lawn Irrigation
System Around
Foundation

 
 
Knee Wall For Dale's Porch
Roofers Use
Foam Pads
To Protect
Shingles
Teamwork
Makes the
Job Go
Fast !